by Lamont Engineers | Jan 25, 2024
This project included the construction of a new 750,000 gallon glass-lined steel water storage tank, a 1,500 gpm booster pumping system to maintain uniform distribution system pressure and an additional production well. The major components of the project are the...
by Lamont Engineers | Jan 25, 2024
This project entailed the construction of 18,600 linear feet of water distribution main to replace the old piping. The project financing includes a 20 year NYS Environmental Facility Corporation Loan at 0% Interest Rate, for a total project cost of $3,814,000. The...
by Lamont Engineers | Jan 9, 2024
This project entailed the construction of approximately 23,000 feet of water main, a new 0.25 MG pre-cast wire-wound concrete storage tank, and a new control building housing booster pumps, chlorination equipment, and the control and telemetry system. The project...
by Lamont Engineers | Jan 9, 2024
Village of Voorheesville – Water Storage Improvements Project This project entailed the addition of a new 0.5 MG AWWA D110 pre-cast, wire-wound concrete tank to provide distribution storage redundancy, the replacement of 8,900 linear feet of water distribution...