by Lamont Engineers | Jan 25, 2024
This project entailed the replacement of an existing water main along with the installation of a new well, well pump house, supply line, and control upgrades. The major components of the project are the following: New groundwater production well with a floodway...
by Lamont Engineers | Jan 25, 2024
The Village of Round Lake indirectly obtains water from the Saratoga County Water Authority (SCWA) system. Since its start-up in 2010, parts of the SCWA system have been plagued with elevated levels of Disinfection By-products (DBPs). This has resulted in periodic...
by Lamont Engineers | Jan 9, 2024
This project entailed the development and construction of new production wells; the addition of a new 40 ft x 60 ft Water Treatment Plant (WTP) to comply with treatment requirements for Groundwater Under the Direct Influence of Surface Water; and the replacement of...