This project entailed the replacement of an existing water main along with the installation of a new well, well pump house, supply line, and control upgrades. The major components of the project are the following: New groundwater production well with a floodway...
by Lamont Engineers | Jan 25, 2024
This project entailed the construction of a new 165,000-gallon ANSI/AWWA D103 glass-fused-to-steel water tank to provide distribution system storage, replacement of existing 8”, 6”, 4”, and 2” service mains, and the installation of water service meters to all users. ...
by Lamont Engineers | Jan 9, 2024
This project entailed the development and construction of new production wells; the addition of a new 40 ft x 60 ft Water Treatment Plant (WTP) to comply with treatment requirements for Groundwater Under the Direct Influence of Surface Water; and the replacement of...