2013 Town of Middletown Arkville Water District Improvements Project

This project entailed the replacement of an existing water main along with the installation of a new well, well pump house, supply line, and control upgrades. The major components of the project are the following:

  • New groundwater production well with a floodway protective measures
  • Replacement of approximately 3,000 LF of 8” water main by both open trench and directional drilling
  • Water System Control Upgrades to replace the system altitude valve for more precise control of storage levels
  • Water services reconnection
  • A new 32 ft x 28 ft WTP including arsenic removal treatment system, and sodium hypochlorite injection
  • Ground Source Heat Pump HVAC system