This $5.6M project consists of a new wastewater collection system and treatment system for the Hamlet of Hamden, a rural community of about 200 persons.
The major components of the project are include the following:
- 7,500 LF of 8″ Collection Sewers and 1,400 LF of 4″ Laterals
- One (1) Collection System Pump Station with 700 LF of Polyethylene Force Main
- Metering Manhole and Treatment Site Pump Station
- Two (2) 26,000 Gallon Septic Tanks
- Recirculating Sand Filters and Sand Filter and Control Building
- Absorption Bed Dosing Pump Station and Associated Polyethylene Force Mains
- 26,000 gpd Raised Cut-and-fill Soil Absorption Bed Subsurface Treatment and Disposal System
- Preparation of a Stormwater Pollution Prevention Plan (SWPPP)