Ackerly Farm – Subdivision

,

This project consisted of site plan and grading for a 12 lot, 160 acre subdivision in the Town of Andes

The major components of the project included:

  • Site evaluations and planning with the Municipality
  • Site Development Planning & Facility Design
  • On-site Wastewater Treatment System Design
  • Drainage Design and Coordination with NYCDEP
  • Design of Serveral Stormwater Treatment Ponds, Chanels and Roadside Ditches
  • Preparation of a Stormwater Pollution Prevention Plan (SWPPP)
Skills

Posted on

January 25, 2024