Village of Hobart – Mallinckrodt Industries Site Planning & Stormwater Management

The project consisted of Site Design, Hydraulic Calculations and Grading to accommodate a stormwater management system that would be functional and compliment the general aesthetics and landscaping for a 150,000 SF commercial Pharmaceutical manufacturing facility. The general purpose of the design was for run-off control into a tributary of the New York City Reservoir System.

The major components of the project include the following:

  • Site Survey and Evaluation
  • Erosion and Sediment Control
  • Hydrologic and Hydraulic Calculations
  • Water Quality Management – NYCDEP Watershed
  • Retention Basin Design – 1 subsurface, 2 ponds
Skills

Posted on

January 25, 2024