The project consisted of Site Design, Hydraulic Calculations and Grading to accommodate a stormwater management system that would be functional and compliment the general aesthetics and landscaping for a 150,000 SF commercial Pharmaceutical manufacturing facility. The general purpose of the design was for run-off control into a tributary of the New York City Reservoir System.
The major components of the project include the following:
- Site Survey and Evaluation
- Erosion and Sediment Control
- Hydrologic and Hydraulic Calculations
- Water Quality Management – NYCDEP Watershed
- Retention Basin Design – 1 subsurface, 2 ponds