This $7.0M project consisted of a new wastewater collection system and treatment system for the Hamlet of Bloomville, a rural community of about 250 persons.
The major components of the project included the following:
- 10,500 LF of 8″ Collection Sewers and 2,000 LF of 4″ Laterals
- One (1) Collection System Pump Station with 1,200 LF of Polyethylene Force Main
- Metering Manhole and Treatment Site Pump Station
- Two (2) 30,000 Gallon Septic Tanks
- Recirculating Sand Filters and Sand Filter and Control Building
- Absorption Bed Dosing Pump Station and Associated Polyethylene Force Mains
- 30,000 gpd Raised Cut-and-fill Soil Absorption Bed Subsurface Treatment and Disposal System
- Preparation of a Stormwater Pollution Prevention Plan (SWPPP)