This project consisted of site plan and building design of a 4-bay, 60′ x 80′ wood frame, Pre-Engineered facility for the Town of Bovina Highway Department.
The major components of the project are the following:
- Site Evaluations and Planning with Municipality
- Drainage Design and Coordination with NYCDEP
- Project Coordination with Municipality and Contractors
- Design of Street Reconstruction and Drainage System
- Design of Stormwater Treatment System to Treat Road Runoff before Discharge to the Stream