2022 Town of Oneonta Southside Water Project

This project involves the planning, design, and construction of a new water supply and distribution system to enhance service reliability and capacity. The system includes new wells, a well control building, metering infrastructure, distribution and transmission mains, and a 500,000-gallon water storage tank. The improvements are designed to meet current and future water demand, improve system resilience, and comply with applicable regulatory standards.

Scope of Work Includes:

  • Water Supply Infrastructure
    • Development of new groundwater wells
    • Construction of a well control building housing pumping and control equipment
    • Installation of water meters for usage monitoring and system management
  • Water Storage
    • Design and construction of a 500,000-gallon above-ground water storage tank
    • Site grading, tank foundation, and access road improvements
  • Distribution System
    • Installation of approximately 35,000 linear feet (LF) of 8″ IPS HDPE DR 13.5 water main
    • Installation of approximately 3,000 LF of 12″ IPS HDPE DR 13.5 water main
    • Pipe layout designed to provide reliable service coverage, looped connections, and fire flow capability
  • Transmission Main
    • Construction of 1,600 LF of 12″ HDPE water main to serve as the transmission main
    • Connection of the water storage tank to the distribution system via Southside Drive
  • Supporting Infrastructure
    • Valves, hydrants, service connections, and appurtenances
    • Coordination with regulatory agencies for permitting and environmental compliance
    • Preparation of construction drawings, specifications, and bid documents