2014 Hamlet of Berne Wastewater Treatment Plant and Collection System Project

This $3.6 million project consists of a 30,000 gpd wastewater treatment plant and collection system. The major components of the project are the following:

  • Recirculating Sand Filter
  • Headworks
  • Three (3) 10,000 gallon Septic Tanks
  • Post Aeration tank
  • Collection System Pump Station
  • Low Pressure Force mains
  • Gravity Collection System
  • Individual Grinder Pumps
Skills

Posted on

January 9, 2024