by Lamont Engineers | Jan 25, 2024
This project entailed the construction of a new 165,000-gallon ANSI/AWWA D103 glass-fused-to-steel water tank to provide distribution system storage, replacement of existing 8”, 6”, 4”, and 2” service mains, and the installation of water service meters to all users. ...
by Lamont Engineers | Jan 25, 2024
The project consisted of Site Design, Hydraulic Calculations and Grading to accommodate a stormwater management system that would be functional and compliment the general aesthetics and landscaping for a 150,000 SF commercial Pharmaceutical manufacturing facility. The...
by Lamont Engineers | Jan 25, 2024
This project consisted of site plan and building design of a 4-bay, 60′ x 80′ wood frame, Pre-Engineered facility for the Town of Bovina Highway Department. The major components of the project are the following: Site Evaluations and Planning with Municipality Drainage...
by Lamont Engineers | Jan 25, 2024
This project consisted of the design and construction of two (2) – 60’ x 120’ earthen sludge drying beds at the Village of Sidney Wastewater Treatment Plant. Construction of the drying beds allowed the facility to significantly reduce its annual Operation and...
by Lamont Engineers | Jan 25, 2024
This $301,000 project consisted of site plan and building design of a 72’ x 100’ Salt StorageFacility for the Town of Manheim. The major components of the project are include the following: Site Evaluations and Planning with Municipality Structural Evaluation and...