This New York State Shared Services Program project consisted of engineering and construction phase services for the construction of an approximately 3,300 ton sand and salt storage facility utilizing a fabric covered steel framed structure for the Town and Village of Cobleskill.
The major components of the project included the following:
- Site Evaluations and Planning with Town and Village
- Site Development Planning & Facility Design
- Drainage Design
- Project Coordination with Town and Village
This $780,000 project consisted of site plan and building design of a wood frame, Pre-Engineered Fire Station facility for the Grand Gorge Hose Company.
The major components of the project are the following:
- Site Evaluations and Planning with Fire District
- Environmental Review (SEQR)
- Site Development Planning & Facility Design
- Wastewater and Water connection to Municipal Systems
- Drainage Design and Coordination with NYCDEP & NYSDOT
- Project Coordination with Municipality, NYCDEP and Contractors
This $5.6M project consists of a new wastewater collection system and treatment system for the Hamlet of Hamden, a rural community of about 200 persons.
The major components of the project are include the following:
- 7,500 LF of 8″ Collection Sewers and 1,400 LF of 4″ Laterals
- One (1) Collection System Pump Station with 700 LF of Polyethylene Force Main
- Metering Manhole and Treatment Site Pump Station
- Two (2) 26,000 Gallon Septic Tanks
- Recirculating Sand Filters and Sand Filter and Control Building
- Absorption Bed Dosing Pump Station and Associated Polyethylene Force Mains
- 26,000 gpd Raised Cut-and-fill Soil Absorption Bed Subsurface Treatment and Disposal System
197 Elm Street · Cobleskill, NY 12043 | Tel: (518) 234-4028 | lamont@lamontengineers.com |
© Lamont Engineers |
EMPLOYEE ACCESS |