Deprecated: Non-canonical cast (double) is deprecated, use the (float) cast instead in /home/lamont/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/xmlrpc.php on line 216

Deprecated: Non-canonical cast (boolean) is deprecated, use the (bool) cast instead in /home/lamont/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/xmlrpc.php on line 235

Warning: Cannot modify header information - headers already sent by (output started at /home/lamont/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/init.php:21) in /home/lamont/public_html/wp-content/plugins/all-in-one-seo-pack/app/Common/Meta/Robots.php on line 89

Warning: Cannot modify header information - headers already sent by (output started at /home/lamont/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/init.php:21) in /home/lamont/public_html/wp-includes/feed-rss2.php on line 8
Stormwater Projects - Lamont Engineers https://lamontengineers.com Commercial & Municipal Engineering Thu, 06 Jun 2024 19:31:18 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 https://lamontengineers.com/wp-content/uploads/2019/10/cropped-icon-32x32.png Stormwater Projects - Lamont Engineers https://lamontengineers.com 32 32 Village of Hobart – Mallinckrodt Industries Site Planning & Stormwater Management https://lamontengineers.com/project/village-of-hobart-mallinckrodt-industries-site-planning-stormwater-management/?utm_source=rss&utm_medium=rss&utm_campaign=village-of-hobart-mallinckrodt-industries-site-planning-stormwater-management https://lamontengineers.com/project/village-of-hobart-mallinckrodt-industries-site-planning-stormwater-management/#respond Thu, 25 Jan 2024 20:06:44 +0000 https://lamontengineers.com/?post_type=project&p=1260 The project consisted of Site Design, Hydraulic Calculations and Grading to accommodate a stormwater management system that would be functional and compliment the general aesthetics and landscaping for a 150,000 SF commercial Pharmaceutical manufacturing facility. The general purpose of the design was for run-off control into a tributary of the New York City Reservoir System. […]

The post Village of Hobart – Mallinckrodt Industries Site Planning & Stormwater Management first appeared on Lamont Engineers.

]]>
The project consisted of Site Design, Hydraulic Calculations and Grading to accommodate a stormwater management system that would be functional and compliment the general aesthetics and landscaping for a 150,000 SF commercial Pharmaceutical manufacturing facility. The general purpose of the design was for run-off control into a tributary of the New York City Reservoir System.

The major components of the project include the following:

  • Site Survey and Evaluation
  • Erosion and Sediment Control
  • Hydrologic and Hydraulic Calculations
  • Water Quality Management – NYCDEP Watershed
  • Retention Basin Design – 1 subsurface, 2 ponds

The post Village of Hobart – Mallinckrodt Industries Site Planning & Stormwater Management first appeared on Lamont Engineers.

]]>
https://lamontengineers.com/project/village-of-hobart-mallinckrodt-industries-site-planning-stormwater-management/feed/ 0
Catskill Watershed Corporation – Stormwater Retrofit Program https://lamontengineers.com/project/catskill-watershed-corporation-stormwater-retrofit-program/?utm_source=rss&utm_medium=rss&utm_campaign=catskill-watershed-corporation-stormwater-retrofit-program https://lamontengineers.com/project/catskill-watershed-corporation-stormwater-retrofit-program/#respond Thu, 25 Jan 2024 19:57:20 +0000 https://lamontengineers.com/?post_type=project&p=1252 This project consisted of site plan and building design of a 4-bay, 60′ x 80′ wood frame, Pre-Engineered facility for the Town of Bovina Highway Department. The major components of the project are the following:

The post Catskill Watershed Corporation – Stormwater Retrofit Program first appeared on Lamont Engineers.

]]>
This project consisted of site plan and building design of a 4-bay, 60′ x 80′ wood frame, Pre-Engineered facility for the Town of Bovina Highway Department.

The major components of the project are the following:

  • Site Evaluations and Planning with Municipality
  • Drainage Design and Coordination with NYCDEP
  • Project Coordination with Municipality and Contractors
  • Design of Street Reconstruction and Drainage System
  • Design of Stormwater Treatment System to Treat Road Runoff before Discharge to the Stream

The post Catskill Watershed Corporation – Stormwater Retrofit Program first appeared on Lamont Engineers.

]]>
https://lamontengineers.com/project/catskill-watershed-corporation-stormwater-retrofit-program/feed/ 0
2012 Town of Andes Catskill Watershed Corporation Stormwater Retrofit Program Coulter Rd. Stormwater and Pavement Rehabilitation https://lamontengineers.com/project/town-of-roxbury-grand-gorge-water-district-water-system-improvements-project/?utm_source=rss&utm_medium=rss&utm_campaign=town-of-roxbury-grand-gorge-water-district-water-system-improvements-project https://lamontengineers.com/project/town-of-roxbury-grand-gorge-water-district-water-system-improvements-project/#respond Tue, 09 Jan 2024 22:14:12 +0000 https://lamontengineers.com/?post_type=project&p=1181 This project consisted of Stormwater Rehabilitation and Pavement Rehabilitation on Coulter Road in the Town of Andes. The major components of the project include the following:

The post 2012 Town of Andes Catskill Watershed Corporation Stormwater Retrofit Program Coulter Rd. Stormwater and Pavement Rehabilitation first appeared on Lamont Engineers.

]]>
This project consisted of Stormwater Rehabilitation and Pavement Rehabilitation on Coulter Road in the Town of Andes. The major components of the project include the following:

  • Drainage Design and Coordination with CWC and NYCDEP
  • Project Coordination with Municipality and Contractor
  • Design of Street Reconstruction and Drainage System, including new gutters, storm sewers, ditches, and culverts
  • Design of Stormwater Treatment System of check dams and  trash/debris hoods to Treat Road Runoff before Discharge to the Stream

The post 2012 Town of Andes Catskill Watershed Corporation Stormwater Retrofit Program Coulter Rd. Stormwater and Pavement Rehabilitation first appeared on Lamont Engineers.

]]>
https://lamontengineers.com/project/town-of-roxbury-grand-gorge-water-district-water-system-improvements-project/feed/ 0